|
Projects
Some of the projects done by Beta Group and its affiliated companies
are listed below:
1. Sediment and Dredging Engineering
-
Dredging in Khour Soltani
-
Hydrodynamic and sediment study of Qeshm
water pipeline from Bandarabbas
-
Study of sedimentation in Harra forest north
of Qeshm
-
Measurement of Hydrodynamic, Sediment and
Meteorological parameters
in PSEEZ site 2
2. Port and Harbor Engineering
-
Design of Hendijan fishing port
-
Phase 2 study of Charak service port
-
Phase 1 and 2 study of Kish fishing shelter
extension
-
Study of extension of Mir Mohanna port in
Kish Island
-
Extension study of Boushehr commercial port
-
Revamp study of Mahshahr oil terminal site
-
Detailed study of oil jetties of Mahshahr oil
terminal
-
Managing Contracting of Kish commercial
port
3. Ocean engineering
-
Design of breakwater and analysis of design
wave of breakwater extension in Neka
industry port
-
Measurement of Hydrography,
Topography, Wave, Current, Water temperature & Salinity in back
water of phase 9 and 10 of Pars
Special Economic Energy
Zone
-
Measurement of seawater intake of Gas To
Liquid plant
4. Marine structure engineering
-
Design of access bridge from Sadra Island to
Boushehr
-
Site design of Khoramshahr skid
-
Site design of ISOICO skid
-
Design of structures and equipments of Sadra
Island dry duck
5.Civil and Structure engineering
6. Mechanical and Instrumental engineering
7. Water resource engineering
8. Architecture
-
Design of Gol-e Narges Book bazaar
-
Phase 0 study of residential, cultural and
entertainment complex
-
Supervision building of Melli Bank
-
Design of Nikmanesh house in Bam
-
Design of Naarooyee house in Bam
-
Design of Bahar house in Karadj
-
Design of commercial building in Aligoodarz
-
Cultural complex of Azadegan Square in Karadj
-
Trade complex of Mehrgostar in Najafabad
-
Archeology workshop of Shahr-e Soukhte in
Sistan province
9. Urban planning
-
Study of Kerman city outlook
-
Revamping of old part of Aligoodarz city
-
Revamping of Pastor Square in Tehran
10. Landscaping
11. Inspection
-
Inspection of Mahshahr oil terminal jetties
-
Inspection during installation of Arvand petrochemical
-
Inspection of Yazd compound cycle power plant during procurement
and installation
-
Inspection of Morvarid Petrochemical during installation
-
Inspection of IGAT V
-
Cathodic
protection and corrosion inspection of IGAT V
12. Corrosion engineering
13. Hydrography and survey
-
Hydrography of Mir mohanna port in Kish
Island
-
Hydrography of Sarooj jetty
-
Hydrography of Charak port
-
Hydrography of Hendijan port
14. Electrical engineering
15. Value engineering
|